For more information:
info@tisburyfootpathclub.org
Design © Sue Pocock
Updated October 2026
Tisbury Footpath Club
Our rights of way, footpaths, bridleways and tracks are subject to ongoing change and need to be looked after. These rights of way may be affected by a number of situations including new development, someone’s desire to re-route them or due to blocking by vegetation growth or fallen trees. They need looking after and we try as volunteers to play a part in preserving their future.
Clearing vegetation
Replacing signs
Constructing steps
Repairing gates
Preserving & Maintaining our
Rights of Way
Applications to re-route public rights of way occur from time to time, and where possible we will input into that process from a walker’s perspective. Often the historical knowledge our members have of the area and our local rights of way is valuable in these situations. Change can bring improvements for the walker and the environment, which is welcome, but unfortunately some proposals are detrimental to the experience of using our rights of way. Where possible in these situations we use our voluntary endeavours to resist proposals that would adversely affect our local rights of way.
Re-routing Rights of Way
Maintaining our Rights of Way
Pedestrian gate installation
We also undertake specific maintenance projects, particularly over the winter season when vegetation is not growing. One ongoing winter project is the replacement of the missing or damaged signs, often at the roadside, which mark the start of a right of way. This has been done in Tisbury, West Tisbury and Sutton Mandeville and is being extended into Chilmark and Teffont.
The Footpath Club organises maintenance sessions on the second Monday of every month and a variety of tasks are undertaken. If you would like to join these volunteers, then please make contact with us by emailing info@tisburyfootpathclub.org
You do not have to be a Footpath Club member to join in.
Stiles, gates, flights of steps, bridges and revetments all need to be maintained and from time to time renewed or introduced. We undertake this infrastructure work in conjunction with Wiltshire Council and often alongside the South Wiltshire Ramblers Heavy Gang. The Footpath Club has instigated the replacement of many stiles by pedestrian gates in our local area, which is in line with Wiltshire Council policy and has improved substantially ease of access to our countryside.
To keep our rights of way open, seasonal vegetation growth and fallen trees have to be cleared. This is an ongoing task for much of the year which is undertaken by Footpath Club members and other volunteers. In addition volunteers check for and replace missing way markers on our rights of way.
Building bridges
Timber bridge with sleeper walkways
Flight of steps
Hooped pedestrian gate